<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Marion County - File #: 2026-22877</title><link>https://marionfl.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8000568&amp;GUID=2A5AD179-1EFB-4DB5-A23F-E6E8B996E706</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://marionfl.legistar.com/Feed.ashx?GUID=2A5AD179-1EFB-4DB5-A23F-E6E8B996E706&amp;ID=8000568&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Marion County - File #: 2026-22877</title><link>https://marionfl.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8000568&amp;GUID=2A5AD179-1EFB-4DB5-A23F-E6E8B996E706</link><guid isPermaLink="false">2A5AD179-1EFB-4DB5-A23F-E6E8B996E706-2026-05-01-19-10-37</guid><description>Title: The Church on the Hill Entry Canopy- Major Site Plan 000493- Waiver to Major Site Plan
Parcel # 37229-000-00     #WaiverPIR-000675-2026
MCA Consulting Engineers, Inc.

LDC 2.21.1 Applicability
CODE states A. Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds the lesser of 35 percent of the gross site area or 9,000 square feet; (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips; or (3) A 24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area.
APPLICANT request - the proposed improvement consists of a small, covered entry walkway and approximately 305 square feet of new asphalt to support the church’s van drop-off area. The scope of work is limited in nature and does not increase intensity of use, modify traffic circulation, or require storm</description><pubDate>Fri, 01 May 2026 19:10:37 GMT</pubDate></item></channel></rss>