<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Marion County - File #: 2026-22875</title><link>https://marionfl.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8000566&amp;GUID=40B4DC86-B594-4948-BAC0-2C427D0D3051</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://marionfl.legistar.com/Feed.ashx?GUID=40B4DC86-B594-4948-BAC0-2C427D0D3051&amp;ID=8000566&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Marion County - File #: 2026-22875</title><link>https://marionfl.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8000566&amp;GUID=40B4DC86-B594-4948-BAC0-2C427D0D3051</link><guid isPermaLink="false">40B4DC86-B594-4948-BAC0-2C427D0D3051-2026-05-01-19-10-17</guid><description>Title: Arden of Ocala- Mass Grading Plan 000394 - Waiver to Mass Grading Plan in Review
Parcel # 9018-0000-06 &amp; 37471-013-00     #WaiverPIR-000677-2026
Dave Schmitt Engineering, Inc.

LDC 6.13.6.A.3.c Stormwater quality criteria
CODE states Dry retention systems that have a depth of six feet or less, measured from top of bank to pond bottom, with side slopes that are no steeper than 4:1 and sodded bottoms.
APPLICANT request - Due to the site constraints, we are requesting a pond depth variance from 6 ft to 9 ft per the current plan. 1) The SJRWMD required a 20 ft maintenance berm on sides we have slope. 2) Since the pond doesn’t recover the full amount, we had to hold back-to-back 100 year/24-hour storm events, which they approved. 3) We back-to-back maintain a 75 ft distance from the current existing well on site.</description><pubDate>Fri, 01 May 2026 19:10:17 GMT</pubDate></item></channel></rss>