<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Marion County - File #: 2026-22876</title><link>https://marionfl.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8000567&amp;GUID=EA33870C-6101-46DB-9E85-8269AFDBEA7F</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://marionfl.legistar.com/Feed.ashx?GUID=EA33870C-6101-46DB-9E85-8269AFDBEA7F&amp;ID=8000567&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Marion County - File #: 2026-22876</title><link>https://marionfl.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=8000567&amp;GUID=EA33870C-6101-46DB-9E85-8269AFDBEA7F</link><guid isPermaLink="false">EA33870C-6101-46DB-9E85-8269AFDBEA7F-2026-05-01-19-30-12</guid><description>Title: Lowell Correctional Institute - Major Site Plan 33538 - Waiver to Major Site Plan in Review
Parcel #: 07399-083-00     # WaiverPIR-000620-2026
Kimley-Horn and Associates

LDC 6.4.7 and LDC 2.12.8
CODE states Vertical control shall be provided and meet the following: (1) All surveys submitted for the purpose of construction shall show a minimum of two bench marks per site. For linear construction, bench marks shall be set at 1,000-foot intervals. For large acreage sites, additional bench marks may be required by the County Surveyor, not to exceed a ratio of one bench mark per 20 acres. (2) Bench mark information shall be in a current datum approved by the Office of the County Engineer. (3) Plans shall have a statement or table detailing vertical datum and adjustment, including the origin points with name of the agency responsible for establishing the point, with the date of the field survey used to establish the vertical information shown. One copy of the vertical control field notes shall be submitted to the Office of the County Engineer for review. (4) When using stationing, al</description><pubDate>Fri, 01 May 2026 19:30:12 GMT</pubDate></item></channel></rss>