Legislation Details

File #: 2026-23489   
Type: New Business Status: Agenda Ready
File created: 6/26/2026 Meeting Body Development Review Committee
On agenda: 6/29/2026 Final action:
Title: Berean Baptist Church Addition- Waiver Request to Major Site Plan Parcel #: 2335-001-001 # WaiverSTA-000849-2026 Michael W. Radcliffe Engineering LDC 2.21.1.A(1) - Major Site Plan CODE states a Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: 1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet. APPLICANT requests a waiver to a Major Site Plan for the construction of a new 6,000 SF building addition with associated grading, stormwater controls, and erosion control measures. The proposed building will serve as an accessory recreation/gymnasium facility for existing members of Berean Baptist Church. No additional parking is required or proposed. As a condition of the waiver, we would provide signed and sealed stormwater calcula...
Sponsors: Board of County Commissioners
Attachments: 1. 6.6 Berean Baptist Church Addition– Waiver to a Major Site Plan - WaiverSTA-000849-2026.pdf

 

SUBJECT:

Title

Berean Baptist Church Addition- Waiver Request to Major Site Plan

Parcel #: 2335-001-001     # WaiverSTA-000849-2026

Michael W. Radcliffe Engineering

 

LDC 2.21.1.A(1) - Major Site Plan

CODE states a Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: 1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet.

APPLICANT requests a waiver to a Major Site Plan for the construction of a new 6,000 SF building addition with associated grading, stormwater controls, and erosion control measures. The proposed building will serve as an accessory recreation/gymnasium facility for existing members of Berean Baptist Church. No additional parking is required or proposed. As a condition of the waiver, we would provide signed and sealed stormwater calculations demonstrating that the proposed improvements meet applicable stormwater control requirements.

Body

end