Title: Parks and Recreation Fees Fund - Parks and Recreation Fees - $58,080
Attachments: 1. 2026-6-496 $58,080, 2. Agenda Changes PRC000031

 

SUBJECT:

Title

Parks and Recreation Fees Fund - Parks and Recreation Fees - $58,080

Body

 

INITIATOR:

DEPARTMENT:

Jim Couillard, PLA, ASLA, Director

Parks & Recreation

 

DESCRIPTION/BACKGROUND:

The current expenditure budget appropriation is inadequate because a change in construction requirements occurred during the installation of the floating dock system at the Heagy Burry Boat Ramp project. During construction, it was determined that the originally specified 6-inch diameter wood dock pilings must be replaced with 10-inch diameter steel dock pilings in order to meet structural and installation requirements for the floating dock system. This modification requires additional labor, materials, and retrofitting of the floating dock system. The change order also includes a credit associated with the removal of the original Bid Line Item 36 that specified the wood piling installation. Because this modification was not included in the original project budget, additional funding is required to complete the work.

 

BUDGET/IMPACT:

Neutral

 

RECOMMENDED ACTION:

Recommended action

Approve attached Budget Amendment Resolution and amend the CIP.