SUBJECT:
Title
Pardee Maricamp Storage - Major Site Plan 000555 - Waiver to Major Site Plan in Review
Parcel #: 31385-000-00 # WaiverPIR-000861-2026
Kimley-Horn and Associates
LDC 2.12.8 Current boundary and topographic survey
CODE Current boundary and topographic survey (one foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17 FAC. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor.
APPLICANT We request waiver for survey age. Field work was completed following FDOT improvements to Maricamp and the site has remained undeveloped since.
LDC 2.12.8 Topographical contours
CODE Current boundary and topographic survey (one foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17 FAC. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor.
APPLICANT Waiver request for 100’ contour adjacent to site. Lidar was previously utilized to determine offsite flows and historical drainage patterns which affected the project area.
Body
end