File #: 2026-23812   
Type: New Business Status: Agenda Ready
File created: 7/23/2026 Meeting Body Development Review Committee
On agenda: 7/27/2026 Final action:
Title: TWS Bluewater Investments, LLC- Waiver Request to Major Site Plan Parcel #: 4904-001-006 # WaiverSTA-000892-2026 Davis Dinkins Engineering This item was tabled until 7/27/26 at the 6/29/26 DRC Meeting. A motion to un-table will be needed. LDC 2.21.1. Applicability CODE states A Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds the lesser of 35 percent of the gross site area or 9,000 square feet; (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips; or (3) A 24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area. APPLICANT requests the waiver because the owner needs a building permit for sheds that were installed or replaced. The added a...
Sponsors: Board of County Commissioners
Attachments: 1. 6.5 TWS Bluewater Investments, LLC– Waiver to a Major Site Plan - WaiverSTA-000892-2026.pdf

 

SUBJECT:

Title

TWS Bluewater Investments, LLC- Waiver Request to Major Site Plan

Parcel #: 4904-001-006     # WaiverSTA-000892-2026

Davis Dinkins Engineering

 

This item was tabled until 7/27/26 at the 6/29/26 DRC Meeting. A motion to un-table will be needed.

 

LDC 2.21.1. Applicability

CODE states A Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds the lesser of 35 percent of the gross site area or 9,000 square feet; (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips; or (3) A 24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area.

APPLICANT requests the waiver because the owner needs a building permit for sheds that were installed or replaced. The added area is de minimis.