Title: Labby Residence - Ocala Waterway Estates - Waiver Request to Water Line Connection Parcel #: 3579-001-291 #WaiverSTA-001112-2026 Florida Prime Construction LDC 6.14.2.B(1)(A) Water main connection CODE states New development in the Urban or Rural area shall connect to a centralized water system with available capacity if a water line is within a connection distance of 400 feet times the total number of Equivalent Residential Connections (ERCs). APPLICANT requests a waiver from the water main connection as it is extremely cost prohibitive (about $40,000). A well is requested and in line with what all other residents on the street have.
Sponsors: Board of County Commissioners
Attachments: 1. 6.4 Labby Residence - Ocala Waterway Estates - Waiver Request to Water Line Connection - WaiverSTA-001112-2026.pdf

 

SUBJECT:

Title

Labby Residence - Ocala Waterway Estates - Waiver Request to Water Line Connection

Parcel #: 3579-001-291     #WaiverSTA-001112-2026

Florida Prime Construction

 

LDC 6.14.2.B(1)(A) Water main connection

CODE states New development in the Urban or Rural area shall connect to a centralized water system with available capacity if a water line is within a connection distance of 400 feet times the total number of Equivalent Residential Connections (ERCs).

APPLICANT requests a waiver from the water main connection as it is extremely cost prohibitive (about $40,000). A well is requested and in line with what all other residents on the street have.