SUBJECT:
Title
Tractor Supply Major Site Plan - Waiver Request
115 Bahia Avenue Pl Ocala
Project #2025080006 #33165 Parcel #37491-003-00
Mastroserio Engineering
LDC 2.21.4 - Construction, Completion, and Closeout
CODE states A. Major Site Plans shall be valid for two years with a one-time extension of one year if requested in writing by the applicant and approved by DRC. B. If connection to any stormwater facility which is public or will become public is proposed, the applicant is required to provide for the inspection of the surface water management system by a appropriately licensed design professional to assure that the system is properly constructed and maintained. The inspection shall occur within 30 days of project completion. The County shall be copied on all inspection reports required by the governing Water Management District permit for operation and maintenance. C. The development of any improvements made pursuant to an approved Major Site Plan shall be inspected and approved by the Office of the County Engineer prior to the issuance of a Certificate of Occupancy. D. The applicant shall notify the Office of the County Engineer for onsite improvement work 72 hours prior to commencing construction. E. All improvements shall be constructed in accordance with approved plans. F. As-Built Submittal. (1) Two sets of As-Built/Record Survey signed and sealed by a Professional Surveyor and Mapper meeting standards set forth in Ch. 5J-17 FAC shall be submitted prior to final inspection along with a digital version of the survey in a format pre-approved by the Office of the County Engineer. (2) Inspection and material testing of all improvements shall be submitted in one report with the As-Built/Record Survey. G. Certification of Final Completion. When all required improvements have been constructed, the applicant shall so advise the Office of the County Engineer and submit a request for final inspection with a certification of final completion. The certification form is available at the Office of the County Engineer. After all work is completed, inspected, and accepted by the County, a letter of completion will be issued to the applicant. H. Execute utility easement agreements prior to certification of final completion.
APPLICANT request - the owner requests a waiver to allow the commencement of Building Construction prior to the final plat approval. The final plat has been submitted and is currently under review. A final C.O. hold can be placed on the building permit until the final plat is approved/recorded. Furthermore, the overall parcel that exists now is a parcel of record. The final plat shows the proposed subdivision of the Tractor Supply lot from the existing parent parcel.
Body
end