File #: 2024-16425   
Type: New Business Status: Agenda Ready
File created: 8/23/2024 Meeting Body Development Review Committee
On agenda: 8/26/2024 Final action:
Title: Calesa Township-Perlino Grove (FKA: Calesa Phase 5) - Waiver Request to Preliminary Plat in Review 3835 SW 80th Ave Ocala Project #2024060025 #31660 Parcel #35300-000-14 Tillman & Associates Engineering LDC 6.12.9.K - Subdivision roads and related infrastructure CODE states Centerline radii shall be designed to accommodate the minimum design speed of 30 mph for subdivision local and minor local roads, 40 mph for major local and collector roads, and 45 mph for arterial roads in accordance with FDOT and AASHTO Standards. APPLICANT requests waiver to reduce design speeds to a minimum of 10 mph. Proposed curves warranting this design speed will have proper signage per MUTCD.
Attachments: 1. 6.5 Calesa Township-Perlino Grove (fka Calesa Phase 5) - Waiver Request to Preliminary Plat in Review - 31660_

 

SUBJECT:

Title

Calesa Township-Perlino Grove (FKA: Calesa Phase 5) - Waiver Request to Preliminary Plat in Review

3835 SW 80th Ave   Ocala 

Project #2024060025     #31660     Parcel #35300-000-14

Tillman & Associates Engineering

 

LDC 6.12.9.K - Subdivision roads and related infrastructure

CODE states Centerline radii shall be designed to accommodate the minimum design speed of 30 mph for subdivision local and minor local roads, 40 mph for major local and collector roads, and 45 mph for arterial roads in accordance with FDOT and AASHTO Standards.

APPLICANT requests waiver to reduce design speeds to a minimum of 10 mph. Proposed curves warranting this design speed will have proper signage per MUTCD.

Body

 

 

end