Title: Firestone Ocala Freedom - Major Site Plan Project #2024090064 #32039 Parcel #35699-006-06, 35699-006-04 Common Oak Engineering, LLC LDC 2.21.4 - Construction, completion, and close out CODE states A. Major Site Plans shall be valid for two years with a one-time extension of one year if requested in writing by the applicant and approved by DRC. B. If connection to any stormwater facility which is public or will become public is proposed, the applicant is required to provide for the inspection of the surface water management system by a appropriately licensed design professional to assure that the system is properly constructed and maintained. The inspection shall occur within 30 days of project completion. The County shall be copied on all inspection reports required by the governing Water Management District permit for operation and maintenance. C. The development of any improvements made pursuant to an approved Major Site Plan shall be inspected and approved by the Office of ...
Sponsors: Board of County Commissioners
Attachments: 1. 6.2 Firestone Ocala Freedom - Waiver Request to a Major Site Plan in Review - 32039_.pdf

 

SUBJECT:

Title

Firestone Ocala Freedom - Major Site Plan

Project #2024090064     #32039     Parcel #35699-006-06, 35699-006-04

Common Oak Engineering, LLC

 

LDC 2.21.4 - Construction, completion, and close out

CODE states A. Major Site Plans shall be valid for two years with a one-time extension of one year if requested in writing by the applicant and approved by DRC. B. If connection to any stormwater facility which is public or will become public is proposed, the applicant is required to provide for the inspection of the surface water management system by a appropriately licensed design professional to assure that the system is properly constructed and maintained. The inspection shall occur within 30 days of project completion. The County shall be copied on all inspection reports required by the governing Water Management District permit for operation and maintenance. C. The development of any improvements made pursuant to an approved Major Site Plan shall be inspected and approved by the Office of the County Engineer prior to the issuance of a Certificate of Occupancy. D. The applicant shall notify the Office of the County Engineer for onsite improvement work 72 hours prior to commencing construction. E. All improvements shall be constructed in accordance with approved plans. F. As-Built Submittal. (1) Two sets of As-Built/Record Survey signed and sealed by a Professional Surveyor and Mapper meeting standards set forth in Ch. 5J-17 FAC shall be submitted prior to final inspection along with a digital version of the survey in a format pre-approved by the Office of the County Engineer. (2) Inspection and material testing of all improvements shall be submitted in one report with the As-Built/Record Survey. G. Certification of Final Completion. When all required improvements have been constructed, the applicant shall so advise the Office of the County Engineer and submit a request for final inspection with a certification of final completion. The certification form is available at the Office of the County Engineer. After all work is completed, inspected, and accepted by the County, a letter of completion will be issued to the applicant. H. Execute utility easement agreements prior to certification of final completion.

APPLICANT requests to start clearing and grubbing the property and building the earth pad.