Title: Baseline Road Industrial - Waiver Request to Major Site Plan in Review 6259 SE 78th St Ocala Project #2024050052 #32452 Parcel #37490-000-00 Kimley-Horn & Associates This item was tabled by DRC on 3/31/25 and 4/7/25. This is a request to be reheard. LDC 6.13.6.A(3)(c) - Stormwater Quality Criteria CODE states Dry retention systems that have a depth of six feet or less, measured from top of bank to pond bottom, with side slopes that are no steeper than 4:1 and sodded bottoms. APPLICANT requests waiver to allow a stormwater pond depth of 7.5 feet. Similar pond depths have been approved on like-use projects in the County. Geotechnical borings do not indicate karst features area present in the pond excavation.
Attachments: 1. 6.8 Baseline Road Industrial – Waiver Request to Major Site Plan in Review - Tabled on 3-31-25 and 4-7-25 -32452_.pdf

 

SUBJECT:

Title

Baseline Road Industrial - Waiver Request to Major Site Plan in Review

6259 SE 78th St   Ocala 

Project #2024050052     #32452     Parcel #37490-000-00

Kimley-Horn & Associates

 

This item was tabled by DRC on 3/31/25 and 4/7/25. This is a request to be reheard.

 

LDC 6.13.6.A(3)(c) - Stormwater Quality Criteria

CODE states Dry retention systems that have a depth of six feet or less, measured from top of bank to pond bottom, with side slopes that are no steeper than 4:1 and sodded bottoms.

APPLICANT requests waiver to allow a stormwater pond depth of 7.5 feet. Similar pond depths have been approved on like-use projects in the County. Geotechnical borings do not indicate karst features area present in the pond excavation.