Legislation Details

File #: 2026-23001   
Type: New Business Status: Agenda Ready
File created: 5/8/2026 Meeting Body Development Review Committee
On agenda: 5/11/2026 Final action:
Title: Sandy Clay Residential - Preliminary Plat #000382 - Waiver to Preliminary Plat in Review Parcel #: 37896-000-00, 37896+000-01 # WaiverPIR-000740-2026 Tillman & Associates Engineering, LLC LDC 6.12.9 - Subdivision Roads and Related Infrastructure CODE states Centerline radii shall be designed to accommodate the minimum design speed of 30 mph for subdivision local and minor local roads, 40 mph for major local and collector roads, and 45 mph for arterial roads in accordance with FDOT and AASHTO Standards. APPLICANT - Waiver requested for the roadway centerlines not meeting centerline radii for 30 mph design speed. Proposed curves warranting lower design speeds will have proper signage. 2.12.8 Current Boundary & Topographical Contours CODE states Current boundary and topographic survey (one foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, m...
Sponsors: Board of County Commissioners
Attachments: 1. 6.7 Sandy Clay Residential - Preliminary Plat 000382 - Waiver to Pre-plat in Review 000740.pdf

 

SUBJECT:

Title

Sandy Clay Residential - Preliminary Plat #000382 - Waiver to Preliminary Plat in Review

Parcel #: 37896-000-00, 37896+000-01     # WaiverPIR-000740-2026

Tillman & Associates Engineering, LLC

 

LDC 6.12.9 - Subdivision Roads and Related Infrastructure

CODE states Centerline radii shall be designed to accommodate the minimum design speed of 30 mph for subdivision local and minor local roads, 40 mph for major local and collector roads, and 45 mph for arterial roads in accordance with FDOT and AASHTO Standards.

APPLICANT - Waiver requested for the roadway centerlines not meeting centerline radii for 30 mph design speed. Proposed curves warranting lower design speeds will have proper signage.

 

2.12.8 Current Boundary & Topographical Contours

CODE states Current boundary and topographic survey (one foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17 FAC. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor.

APPLICANT - Request to use the current boundary and topographic survey included with the Mass Grading approval (AR #29724). The project is currently being mass graded per the approved plans. Obtaining an updated topographic survey is not feasible or beneficial due to the mass grading efforts.

 

LDC 2.1.3. - Order of plan approval

CODE states Plans listed below may be reviewed concurrently, but must be approved in the order listed below, when applicable and when the proper land use and zoning are in place: A. Master Plan. B. Preliminary Plat. C. Improvement Plan. D. Final Plat. E. Major Site Plan. However, a Major Site Plan can be substituted for the Improvement Plan and can be approved before approval of the Final Plat in cases when the infrastructure improvements supporting the plat are proposed as part of the Major Site Plan application.

APPLICANT - Request to allow for approval of the Preliminary Plat prior to the Master Plan. The Master Plan has been reviewed by staff twice with only two comments remaining, one being a current survey. The Developer understands that moving forward will be at their own risk.

Body

end