Title: Redeemer Christian School Expansion - Waiver Request to Waste Water Connection 159 SW 87th PL All Units Ocala Project #2017120024 #32470 Parcel #36762-001-00 Infinite Engineering This item was tabled on 2/24/25. LDC 6.14.2.C(2) - Connection Requirements CODE states wastewater system. All new development shall connect to an existing central sewer system if a system with available capacity has a treatment plant or sewer line within a connection distance of 400 feet times the total number of ERCs within the project at build out. Otherwise, the project shall comply with the following as applicable APPLICANT requests a waiver as design and permitting alone has been determined to cost $100,000.00 with projected construction cost of the master lift station and force main at 1,700,000.00. The total design and construction cost for only the wastewater element is near $2M while the cost for the proposed building is estimated at $3M.
Attachments: 1. 6.4 Redeemer Christian School - Elementary Expansion - Waiver Request to Sewer Connection - Tabled on 2-24-25 - 32470_

 

SUBJECT:

Title

Redeemer Christian School Expansion - Waiver Request to Waste Water Connection

159 SW 87th PL All Units Ocala 

Project #2017120024     #32470     Parcel #36762-001-00    

Infinite Engineering

 

This item was tabled on 2/24/25.

 

LDC 6.14.2.C(2) - Connection Requirements

CODE states wastewater system. All new development shall connect to an existing central sewer system if a system with available capacity has a treatment plant or sewer line within a connection distance of 400 feet times the total number of ERCs within the project at build out. Otherwise, the project shall comply with the following as applicable

APPLICANT requests a waiver as design and permitting alone has been determined to cost $100,000.00 with projected construction cost of the master lift station and force main at 1,700,000.00. The total design and construction cost for only the wastewater element is near $2M while the cost for the proposed building is estimated at $3M.

Body

 

 

end