SUBJECT:
Title
City of Belleview Presentation - Proposed City / County Roadway Mill/Resurface/Sidewalk Project: SE 55th Ave Road from US 441 to CR 484
Body
INITIATOR:
DEPARTMENT:
Bob Titterington, P.E., Director
Public Works
DESCRIPTION/BACKGROUND:
A short cut is provided via E 55th Ave Rd from US 441 to CR 484 to access CR 484 South. The cut through and local traffic have impacted the road requiring a higher level of maintenance and pothole repair. The roadway has shared maintenance responsibilities by the City and County owning and accepting portions of the roadway segments. The other segments are not claimed to be the responsibility of either entity.
City staff has proposed a draft agreement, which has not been reviewed by legal, to mill, resurface and provide a sidewalk on one side of the road for safety. The agreement outlines the cost share construction percentage for each entity and proposes the city assuming long term maintenance for the 0.9-mile roadway.
BUDGET/IMPACT:
None
RECOMMENDED ACTION:
Recommended action
Review and discussion.
end