Skip to main content
File #: 2021-2397   
Type: New Business Status: Agenda Ready
File created: 3/5/2021 Meeting Body Development Review Committee
On agenda: 3/8/2021 Final action:
Title: A&M PROPERTY DEVELOPMENT PID #9009-0084-04 - WAIVER REQUEST SILVER SPRINGS SHORES UNIT 9 BLK 84 LOT 4 50 PINE TRACE OCALA Project #2021020101 #26315 Parcel #9009-0084-04 Permit #2021020628 A & M Property Development LDC 6.14.2.B(1)(a) - Water Connection for New Single Family Residential CODE states new single family residential in the Urban or Rural area shall connect to a centralized water system with available capacity if a water line is within a connection distance of 400 feet. APPLICANT requests waiver because, after starting construction paperwork, they were made aware that they would have to tap into the water main pipe. The applicant cannot afford the additional $22,000.00. Also, all properties in that block have wells and no one would not benefit. Mr. Gabre Nelson owns adjacent Lot 5 (PID #9009-0084-05) and was approved for a well by the BCC on October 20, 2020. The applicant hopes they are, too.
Attachments: 1. A&M Property Development PID #9009-0084-04 _26315 water.pdf

 

SUBJECT:

Title

A&M PROPERTY DEVELOPMENT PID #9009-0084-04 - WAIVER REQUEST

SILVER SPRINGS SHORES UNIT 9 BLK 84 LOT 4

50 PINE TRACE OCALA 

Project #2021020101      #26315      Parcel #9009-0084-04      Permit #2021020628

A & M Property Development

LDC 6.14.2.B(1)(a) - Water Connection for New Single Family Residential

CODE states new single family residential in the Urban or Rural area shall connect to a centralized water system with available capacity if a water line is within a connection distance of 400 feet.

APPLICANT requests waiver because, after starting construction paperwork, they were made aware that they would have to tap into the water main pipe. The applicant cannot afford the additional $22,000.00. Also, all properties in that block have wells and no one would not benefit. Mr. Gabre Nelson owns adjacent Lot 5 (PID #9009-0084-05) and was approved for a well by the BCC on October 20, 2020. The applicant hopes they are, too.

Body

end