File #: 2026-22231   
Type: New Business Status: Agenda Ready
File created: 2/27/2026 Meeting Body Development Review Committee
On agenda: 3/2/2026 Final action:
Title: JR Plastics (2008 Expansion) - Waiver to Major Site Plan Parcel #: 31239-005-02 #000299 Mastroserio Engineering LDC 2.21.1 Major Site Plan CODE states A. A Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet. (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips. (3) A ROTARY SPORTSPLEX (REVISION TO AR# 30224)24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area. APPLICANT - a waiver is requested to not submit or provide a Major Site Plan for this project. A building plan has been submitted and is under review by the Building Department. A site plan was submitted with the building appl...
Sponsors: Board of County Commissioners
Attachments: 1. 6.5 JR PLASTICS EXPANSION - Waiver to Major Site Plan - 000299.pdf

 

SUBJECT:

Title

JR Plastics (2008 Expansion) - Waiver to Major Site Plan

Parcel #: 31239-005-02     #000299

Mastroserio Engineering

 

LDC 2.21.1 Major Site Plan

CODE states A. A Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet. (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips. (3) A ROTARY SPORTSPLEX (REVISION TO AR# 30224)24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area.

APPLICANT - a waiver is requested to not submit or provide a Major Site Plan for this project. A building plan has been submitted and is under review by the Building Department. A site plan was submitted with the building application, the proposed 10,200 sf building is being placed over existing impervious area. It will be an open air steel building to be utilized for storage of existing materials produced onsite. There will not be an impervious area increase or a pervious area decrease. The existing site has been approved for 9.7 acres of impervious area. The existing & proposed impervious area equals 6.28 acres. Therefore, the proposed building & impervious areas are allowable and do not exceed the approved impervious area. This is merely an accessory use building to serve the existing business and this development will not have any adverse impacts to the development.