Skip to main content
File #: 2025-20230   
Type: New Business Status: Agenda Ready
File created: 8/8/2025 Meeting Body Development Review Committee
On agenda: 8/11/2025 Final action:
Title: Firestone Ocala Freedom - Major Site Plan - Waiver Request to a Major Site Plan in Review Project #2024090064 #32039 Parcel #35699-006-06 Common Oak Engineering, LLC LDC 6.13.2.A(3) - Stormwater Management - Minimum Requirements CODE states the location and design parameters for all retention/detention areas including: (a) Dimensions or coordinates for constructability. (b) Cross sections, to scale, along the width and length of each pond, showing the design high water elevation, estimated seasonal high water elevation, pond top elevation, pond bottom elevation, side slope steepness, maintenance berm width, sod stabilization of the pond side slopes, and appropriate vegetative cover on the pond bottom. A typical cross section can be used instead when sufficient information is shown on the plan view which minimally includes pond width and length call outs as measured at the pond's top and bottom elevations. (c) Soil boring location with labels. APPLICANT request - we are seeking...
Attachments: 1. 6.6 FIRESTONE OCALA FREEDOM Waiver Request to Major Site Plan in Review 32039_.PDF

 

SUBJECT:

Title

Firestone Ocala Freedom - Major Site Plan - Waiver Request to a Major Site Plan in Review

Project #2024090064     #32039     Parcel #35699-006-06

Common Oak Engineering, LLC

 

LDC 6.13.2.A(3) - Stormwater Management - Minimum Requirements

CODE states the location and design parameters for all retention/detention areas including: (a) Dimensions or coordinates for constructability. (b)

Cross sections, to scale, along the width and length of each pond, showing the design high water elevation, estimated seasonal high water elevation, pond top elevation, pond bottom elevation, side slope steepness, maintenance berm width, sod stabilization of the pond side slopes, and appropriate vegetative cover on the pond bottom. A typical cross section can be used instead when sufficient information is shown on the plan view which minimally includes pond width and length call outs as measured at the pond's top and bottom elevations. (c) Soil boring location with labels.

APPLICANT request - we are seeking this waiver to allow the two pond bottoms to either be sodded or seeded.

Body

end