Title: Home and Hanger - Waiver Request to Major Site Plan Project #2025080038 #33236 Parcel #37511-022-07 Abshier Engineering, Inc. LDC 2.21.1.A - Applicability - Major Site Plan CODE states a Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet. (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips. (3) A 24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area. APPLICANT request - The applicant stated the site is 1.06 acres. The owner will compensate for the increase of the runoff from the existing and future planned impervious area of 6,000 square feet. We will work with Marion County St...
Sponsors: Board of County Commissioners
Attachments: 1. 6.8 Home and Hangar - Waiver Request to Major Site Plan - 33236_.pdf

 

SUBJECT:

Title

Home and Hanger - Waiver Request to Major Site Plan

Project #2025080038     #33236     Parcel #37511-022-07

Abshier Engineering, Inc.

 

LDC 2.21.1.A - Applicability - Major Site Plan

CODE states a Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet. (2) The combined driveway trip generation meets or exceeds 50 peak hour vehicle trips. (3) A 24-inch diameter pipe, its equivalent, or larger is utilized to discharge stormwater runoff from the project area.

APPLICANT request – The applicant stated the site is 1.06 acres. The owner will compensate for the increase of the runoff from the existing and future planned impervious area of 6,000 square feet. We will work with Marion County Stormwater staff on the required stormwater controls. 