File #: 2025-18525   
Type: New Business Status: Agenda Ready
File created: 3/14/2025 Meeting Body Development Review Committee
On agenda: 3/17/2025 Final action:
Title: Diamond "A" Shopping Center Pre-Plat - Waiver Request Preliminary Plat in Review Project #2024080096 #31953 Parcel #41200-056-04 Tillman & Associates Engineering This item was tabled by DRC on 3/10/25. This was resubmitted by the applicant and routed for review on 3/14/25. Comments included with this agenda item are from the previous staff review. LDC 6.12.2.A - Right-of-way CODE states Right-of-way shall be platted or dedicated, meeting the minimum right-of-way width established in Table 6.12-1, to provide for the necessary access and other needed infrastructure improvements supporting the proposed development. Right-of-way can be provided by easement if approved by DRC. APPLICANT is requesting public Right of Way easement instead of public Right of Way dedication for the 8' sidewalk adjacent to the proposed turn lanes. A 6' right of way dedication is proposed along the right turn lanes to keep all roadway improvements within the Right of Way and the 8' sidewalk wi...
Attachments: 1. 6.6 Diamond A Shopping Center Pre-Plat - Waiver Request to Preliminary Plat in Review - Tabled on 3-10-25 - 31953_

 

SUBJECT:

Title

Diamond “A” Shopping Center Pre-Plat - Waiver Request Preliminary Plat in Review   

Project #2024080096     #31953     Parcel #41200-056-04    

Tillman & Associates Engineering

 

This item was tabled by DRC on 3/10/25. This was resubmitted by the applicant and routed for review on 3/14/25. Comments included with this agenda item are from the previous staff review.

 

LDC 6.12.2.A - Right-of-way

CODE states Right-of-way shall be platted or dedicated, meeting the minimum right-of-way width established in Table 6.12-1, to provide for the necessary access and other needed infrastructure improvements supporting the proposed development. Right-of-way can be provided by easement if approved by DRC.

APPLICANT is requesting public Right of Way easement instead of public Right of Way dedication for the 8' sidewalk adjacent to the proposed turn lanes. A 6' right of way dedication is proposed along the right turn lanes to keep all roadway improvements within the Right of Way and the 8' sidewalk will run adjacent to the 20' wide 475A buffer easement that has provisions to allow that required walkway within the 475A buffer easement.

Body

 

 

end