File #: 2024-14515   
Type: New Business Status: Agenda Ready
File created: 3/15/2024 Meeting Body Development Review Committee
On agenda: 3/18/2024 Final action:
Title: City of Belleview - Waiver Request to Water Connection 6966 SE 110TH ST Belleview Project #2024030011 #31258 Parcel #38787-001-01 Permit #2024020086 Drake John LDC 6.14.2.B(1)(a) - Connection requirements CODE New single family residential in the Urban or Rural area shall connect to a centralized water system with available capacity if a water line is within a connection distance of 400 feet. APPLICANT states new home being built in place of Mobile Home, would like to use existing well. Cost to connect to City of Belleview would be about $7,000 (plumber cost to run new line, quotes attached and city connection fees) and then would have a monthly non-residence rate. New line would have to come through back of property and pass through tree roots and other structures on property. We do not live in city limits. Well is in excellent working order and pipes are already in the general area for the new build.
Attachments: 1. 6.5 City of Belleview - Waiver Request to Water Connection -31258_

 

SUBJECT:

Title

City of Belleview - Waiver Request to Water Connection

6966 SE 110TH ST   Belleview 

Project #2024030011     #31258    

Parcel #38787-001-01     Permit #2024020086

Drake John

 

LDC 6.14.2.B(1)(a) - Connection requirements

CODE New single family residential in the Urban or Rural area shall connect to a centralized water system with available capacity if a water line is within a connection distance of 400 feet.

APPLICANT states new home being built in place of Mobile Home, would like to use existing well. Cost to connect to City of Belleview would be about $7,000 (plumber cost to run new line, quotes attached and city connection fees) and then would have a monthly non-residence rate. New line would have to come through back of property and pass through tree roots and other structures on property. We do not live in city limits. Well is in excellent working order and pipes are already in the general area for the new build.

Body

 

 

end