File #: 2024-14645   
Type: Consent Status: Agenda Ready
File created: 3/22/2024 Meeting Body Development Review Committee
On agenda: 3/25/2024 Final action:
Title: 16429 SW 27TH Circle - Waiver Request to Water Main Extension Project #2024030019 #31270 Parcel #8004-0471-11 Commence Logistics LDC 6.14.2.A(3) - Connection Requirements CODE states when property is within connection distance, the water main shall be extended to the farthest property line by the Developer. Refer to Sec. 6.15.3.B for fire hydrant installation requirements. APPLICANT requests a waiver as a water main exists at parcel's lot line but not across as is required by Code. CONDITIONAL WAIVER approved provided applicant (1) opens a water utility account with MCU; (2) pays all Connection charges; and (3) pays $5K capital connection fee as this is part of an in-house project to design and extend water main for all gaps in Marion Oaks Units 4.
Attachments: 1. 5.6 16429 SW 27th Circle - Waiver Request to Water Main Extension - 31270_

 

SUBJECT:

Title

16429 SW 27TH Circle - Waiver Request to Water Main Extension

Project #2024030019     #31270     Parcel #8004-0471-11

Commence Logistics

 

LDC 6.14.2.A(3) - Connection Requirements

CODE states when property is within connection distance, the water main shall be extended to the farthest property line by the Developer. Refer to Sec. 6.15.3.B for fire hydrant installation requirements.

APPLICANT requests a waiver as a water main exists at parcel's lot line but not across as is required by Code. CONDITIONAL WAIVER approved provided applicant (1) opens a water utility account with MCU; (2) pays all Connection charges; and (3) pays $5K capital connection fee as this is part of an in-house project to design and extend water main for all gaps in Marion Oaks Units 4.

Body

 

 

end