|
| | | | MEMBERS OF THE PUBLIC ARE ADVISED THAT THIS MEETING / HEARING IS A PUBLIC PROCEEDING, AND THE CLERK TO THE BOARD IS MAKING AN AUDIO RECORDING OF THE PROCEEDINGS, AND ALL STATEMENTS MADE DURING THE PROCEEDINGS, WHICH RECORDING WILL BE A PUBLIC RECORD, SUBJECT TO DISCLOSURE UNDER THE PUBLIC RECORDS LAW OF FLORIDA. BE AWARE, HOWEVER, THAT THE AUDIO RECORDING MAY NOT SATISFY THE REQUIREMENT FOR A VERBATIM TRANSCRIPT OF THE PROCEEDINGS, DESCRIBED IN THE NOTICE OF THIS MEETING, IN THE EVENT YOU DESIRE TO APPEAL ANY DECISION ADOPTED IN THIS PROCEEDING. | | |
Not available
|
|
| | 1. | | ROLL CALL | | |
Not available
|
|
| | 2. | | PLEDGE OF ALLEGIANCE | | |
Not available
|
|
| | 3. | | ADOPT THE FOLLOWING MINUTES: | | |
Not available
|
|
2023-12268
| 1 | 3.1. | Minutes | August 7, 2023 | | |
Not available
|
|
| | 4. | | PUBLIC COMMENT | | |
Not available
|
|
| | 5. | | CONSENT AGENDA: STAFF HAS REVIEWED AND RECOMMENDS APPROVAL | | |
Not available
|
|
2023-12269
| 1 | 5.1. | Consent | MARTEL PAVED TRAINING COURSE (REVISION TO 28841) - Major Site Plan Revision
Project #2022070051 #30313
Kimley-Horn & Associates | | |
Not available
|
|
2023-12270
| 1 | 5.2. | Consent | PIONEER RANCH PHASE 3&4 - Preliminary Plat
Project #2023040020 #29974
Tillman & Associates Engineering | | |
Not available
|
|
2023-12274
| 1 | 5.3. | Consent | 3724 SW 133RD LOOP - Waiver Request to Water Main Extension
Project #2023080016 #30475
Parcel #8007-1109-24 Permit #2023051655
Aldana Contracting
LDC 6.14.2.A(3) - Connection requirements
CODE states When property is within connection distance, the water main shall be extended to the farthest property line. Refer to Sec. 6.15.3.B for fire hydrant installation requirements.
APPLICANT requests waiver as water main exists at parcels left lot line but not across as is required by code. CONDITIONAL WAIVER approved provided applicant (1) opens a water utility account with MCU; (2) pays all connection charges; and (3) pays $5K capital connection fee as this is part of a pending ARPA grant to design and extend water main for all gaps in Marion Oaks Unit 7/10. | | |
Not available
|
|
2023-12275
| 1 | 5.4. | Consent | NW 45TH STREET - COUNTRY ESTATES WEST LOT 1 - Waiver Request to Connection Requirements
4401 NW 45TH ST Ocala
Project #2023070075 #30445
Parcel #13701-000-01 Permit #2023063737
Aldana Contracting
LDC 6.14.2 - Connection Requirements
CODE states all new and expanding development projects shall contact the MCUD for determination of availability and/or point of connection. Within ten working days, the MCUD shall issue an official written determination advising the applicant if services are available and, if so, shall indicate the potential source, the nearest connection point, and the need for any additional off-site facilities. Potential sources may include MCUD, a PSC-certified utility, a city, a Community Development District, or other entity authorized by the State of Florida to provide water and wastewater services. The written determination shall accompany all applications for building permits and/or other development reviews
APPLICANT requests a waiver as MCU provided incorrect availability letters during feasibility study regarding sewer and water conne | | |
Not available
|
|
2023-12276
| 1 | 5.5. | Consent | NW 45TH STREET - COUNTRY ESTATES WEST LOT 2 - Waiver Request to Connection Requirements
4415 NW 45TH ST OCALA
Project #2023070081 #30450
Parcel #13701-000-02 Permit #2023063742
Aldana Contracting
LDC 6.14.2 - Connection Requirements
CODE states all new and expanding development projects shall contact the MCUD for determination of availability and/or point of connection. Within ten working days, the MCUD shall issue an official written determination advising the applicant if services are available and, if so, shall indicate the potential source, the nearest connection point, and the need for any additional off-site facilities. Potential sources may include MCUD, a PSC-certified utility, a city, a Community Development District, or other entity authorized by the State of Florida to provide water and wastewater services. The written determination shall accompany all applications for building permits and/or other development reviews
APPLICANT requests a waiver as MCU provided incorrect availability letters during feasibility study regarding sewer and water conne | | |
Not available
|
|
2023-12278
| 1 | 5.6. | Consent | NW 45TH STREET - COUNTRY ESTATES WEST LOT 24 - Waiver Request to Connection Requirements
4440 NW 45TH ST Ocala
Project #2023070080 #30449
Parcel #13701-000-24 Permit #2023063754
Aldana Contracting
LDC 6.14.2 - Connection Requirements
CODE states all new and expanding development projects shall contact the MCUD for determination of availability and/or point of connection. Within ten working days, the MCUD shall issue an official written determination advising the applicant if services are available and, if so, shall indicate the potential source, the nearest connection point, and the need for any additional off-site facilities. Potential sources may include MCUD, a PSC-certified utility, a city, a Community Development District, or other entity authorized by the State of Florida to provide water and wastewater services. The written determination shall accompany all applications for building permits and/or other development reviews
APPLICANT requests a waiver as MCU provided incorrect availability letters during feasibility study regarding sewer and water conn | | |
Not available
|
|
2023-12279
| 1 | 5.7. | Consent | NW 45TH STREET - COUNTRY ESTATES WEST LOT 25 - Waiver Request to Connection Requirements
4428 NW 45TH ST Ocala
Project #2023070079 #30448 Parcel #13701-000-25 Permit #2023063758
Aldana Contracting
LDC 6.14.2 - Connection Requirements
CODE states all new and expanding development projects shall contact the MCUD for determination of availability and/or point of connection. Within ten working days, the MCUD shall issue an official written determination advising the applicant if services are available and, if so, shall indicate the potential source, the nearest connection point, and the need for any additional off-site facilities. Potential sources may include MCUD, a PSC-certified utility, a city, a Community Development District, or other entity authorized by the State of Florida to provide water and wastewater services. The written determination shall accompany all applications for building permits and/or other development reviews
APPLICANT requests a waiver as MCU provided incorrect availability letters during feasibility study regarding sewer and water connec | | |
Not available
|
|
2023-12280
| 1 | 5.8. | Consent | NW 45TH STREET - COUNTRY ESTATES WEST LOT 26 - Waiver Request to Connection Requirements
4414 NW 45TH ST Ocala
Project #2023070078 #30447
Parcel #13701-000-26 Permit #2023063760
Aldana Contracting
LDC 6.14.2 - Connection Requirements
CODE states all new and expanding development projects shall contact the MCUD for determination of availability and/or point of connection. Within ten working days, the MCUD shall issue an official written determination advising the applicant if services are available and, if so, shall indicate the potential source, the nearest connection point, and the need for any additional off-site facilities. Potential sources may include MCUD, a PSC-certified utility, a city, a Community Development District, or other entity authorized by the State of Florida to provide water and wastewater services. The written determination shall accompany all applications for building permits and/or other development reviews
APPLICANT requests a waiver as MCU provided incorrect availability letters during feasibility study regarding sewer and water conn | | |
Not available
|
|
| | 6. | | SCHEDULED ITEMS: | | |
Not available
|
|
2023-12271
| 1 | 6.1. | New Business | US HWY 301 MANCAVES/SHE SHEDS - Major Site Plan
Project #2022030229 #28202
Cadjazz Engineering | | |
Not available
|
|
2023-12272
| 1 | 6.2. | New Business | BETHLEHEM MISSIONARY BAPTIST CHURCH - Waiver Request to Major Site Plan in Review
8750 W HWY 326 Ocala
Project #2017100038 #30137 Parcel #12504-000-00
Bethlehem Missionary Baptist Church
Radcliffe Engineering
LDC 2.21.1.A - Major Site Plan
CODE states A Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet.
APPLICANT states that due to the de minimis nature of this church on its 20.22-acre site in a Rural/Agricultural Location, we are requesting a waiver to provide on-site stormwater controls in lieu of Major Site Plan requirements for proposed 7,525 square feet of new impervious for Sanctuary building and associated parking on 20.22 acres. This equals 0.85 percent of the 20.22-acre property. Previous Sanctuary was damaged by fire and has been demolished. The | | |
Not available
|
|
2023-12273
| 1 | 6.3. | New Business | EON CONSUMER WELFARE MINI-WAREHOUSE - Waiver Request to Major Site Plan in Review
5841 SW 25TH ST Ocala
Project #2022110065 #29416 Parcel #23819-001-03
Pigeon-Ardurra
LDC 6.8.6.K(2) - Buffers
CODE states B-Type buffer shall consist of a 20-foot wide landscape strip with a buffer wall. The buffer shall contain at least two shade trees and three accent/ornamental trees for every 100 lineal feet or fractional part thereof. Shrubs and groundcovers, excluding turfgrass, shall comprise at least 50 percent of the required buffer.
APPLICANT requests waiver for the West Buffer - Code requires a 20-foot-wide Type B Buffer between industrial and government use. Propose to provide a 5-foot Type E Buffer. The adjoining government use of the property is a drainage retention area. Discussions with staff indicated they would support the waiver.
LDC 6.8.6.K(2) - Buffers
CODE states B-Type buffer shall consist of a 20-foot wide landscape strip with a buffer wall. The buffer shall contain at least two shade trees and three accent/ornamental trees for every 100 lineal feet or fr | | |
Not available
|
|
2023-12281
| 1 | 6.4. | New Business | LONGREEN FARM AKA OCALA SOUTH - Waiver Request to Major Site Plan in Review
Project #2021080034 #30064 Parcel #35369-027-01
Atwell
LDC 2.12.8 - Current boundary and topographic survey
CODE states current boundary and topographic survey (one-foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17 FAC. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor.
APPLICANT requests a waiver from the above referenced code section which requires one-foot contours extending 100 feet beyond the project boundary. Surveyor was not able to access others property due to security reasons. However, sufficient contours have been provided for design and no adverse impact on offsite is expected. Per phone conversation with Mr. Kevin Vickers, staff will support this waiver.
LDC 3.13.8.B(7) - Minimum Pipe Size
CODE states Sizes. Stormwater conveyance pipes and cro | | |
Not available
|
|
2023-12282
| 1 | 6.5. | New Business | ARTHURS POINT EAST - Agricultural Lot Split
Project #2021070038 #27054
Allen Heine
A wavier to the establishment of a County MSBU was BCC approved on 8/17/21. | | |
Not available
|
|
2023-12283
| 1 | 6.6. | New Business | CHAMBASIAN FLORIDA HOME - Waiver Request to Major Site Plan
Project #2023080014 #30473 Parcel #4764-042-000
Abshier Engineering
LDC 2.21.1.A(1) - Major Site Plan
CODE states A Major Site Plan shall be submitted for review and approval prior to the issuance of a Building Permit or prior to the construction of site improvements when proposed improvements exceed any of the following thresholds: (1) Collectively, all existing and proposed impervious ground coverage equals or exceeds 35 percent of the gross site area or 9,000 square feet.
APPLICANT requests waiver. The site is 32.2 acres. The owner will work with Marion County Stormwater staff on the required controls. | | |
Not available
|
|
2023-12284
| 1 | 6.7. | New Business | PHOENIX PROGRAMS OF FLORIDA - Waiver Requests to Major Site Plan Revision in Review
15681 N US HWY 301 Citra
Project #2020110044 #30433 & 30485 Parcel #07619-001-04
Hamilton Engineering & Surveying
LDC 2.21.3.A - Review and approval procedures
CODE states DRC shall review this application with staff comments and approve, approve with conditions, or provide further direction to the applicant.
APPLICANT requests waiver to start earthwork to grade and to dig the storm swale prior to plane approval. This is a state funded project with a hard deadline for completion. This finish date is fast approaching; if we don't start the site work soon, the state funds will expire and the project will be lost.
LDC 2.21.3.C - Review and approval procedures
CODE states Upon approval by DRC, a Building Permit may be issued and such approval is authority for applicant to proceed with the site improvements shown on the approved Major Site Plan.
APPLICANT requests waiver to start footer work prior to plan approval. This is a state funded project with a hard deadline for compl | | |
Not available
|
|
2023-12285
| 1 | 6.8. | New Business | OCALA CROSSINGS SOUTH IMPROVEMENT PLAN PHASE 3 - Waiver Request to Improvement Plan in Review
8767 SW 49TH Avenue RD Ocala
Project #2023010074 #30292 Parcel #35623-001-01
Mastroserio Engineering
LDC 2.12.8. - Current boundary and topographic survey
CODE states Current boundary and topographic survey (one-foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17 FAC. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor.
APPLICANT requests waiver to not require an updated topographic survey for the development. The entire site, excluding Phase 1, is currently under construction in accordance with the approved mass grading plan for Phases 2-5. Phase 3 will be graded in accordance with the submittal improvements plans.
LDC 6.13.7. - Geotechnical criteria
CODE states Minimum requirements. (1) Depth. Soil test borings shall be performed to a minimu | | |
Not available
|
|
| | 7. | | CONCEPTUAL REVIEW ITEMS: | | |
Not available
|
|
| | 8. | | DISCUSSION ITEMS: | | |
Not available
|
|
| | 9. | | OTHER ITEMS: | | |
Not available
|
|
| | 10. | | ADJOURN: | | |
Not available
|
|