Meeting Name: Development Review Committee Agenda status: Final
Meeting date/time: 4/13/2026 9:00 AM Action Summary status: Draft  
Meeting location: Office of the County Engineer
Published agenda: Agenda Agenda Published Action Summary: Not available Meeting Extra1: Not available  
Agenda packet: Agenda Packet Agenda Packet
Meeting video:  
Attachments:
File #Ver.Agenda #TypeTitleActionResultVideo
     MEMBERS OF THE PUBLIC ARE ADVISED THAT THIS MEETING / HEARING IS A PUBLIC PROCEEDING, AND THE CLERK TO THE BOARD IS MAKING AN AUDIO RECORDING OF THE PROCEEDINGS, AND ALL STATEMENTS MADE DURING THE PROCEEDINGS, WHICH RECORDING WILL BE A PUBLIC RECORD, SUBJECT TO DISCLOSURE UNDER THE PUBLIC RECORDS LAW OF FLORIDA. BE AWARE, HOWEVER, THAT THE AUDIO RECORDING MAY NOT SATISFY THE REQUIREMENT FOR A VERBATIM TRANSCRIPT OF THE PROCEEDINGS, DESCRIBED IN THE NOTICE OF THIS MEETING, IN THE EVENT YOU DESIRE TO APPEAL ANY DECISION ADOPTED IN THIS PROCEEDING.   Not available
   1. ROLL CALL   Not available
   2. PLEDGE OF ALLEGIANCE   Not available
   3. ADOPT THE FOLLOWING MINUTES:   Not available
2026-22654 13.1.MinutesApril 6, 2026   Not available
   4. PUBLIC COMMENT   Not available
   5. CONSENT AGENDA: STAFF HAS REVIEWED AND RECOMMENDS APPROVAL   Not available
2026-22655 15.1.ConsentFreedom Crossings Mass Grading Plan - Mass Grading Plan Parcel #: 35623-025-04 #30395 Mastroserio Engineering, Inc.   Not available
   6. SCHEDULED ITEMS:   Not available
2026-22656 16.1.New BusinessGolden Ocala - WEC Multi-Use Field Phase1 - Major Site Plan 32969 - Waiver to Major Site Plan in Review Parcel #21087-001-02 #WaiverPIR-000251-2026 Tillman and Associates Engineering, LLC The following requests were tabled for two weeks at the 3/23/26 DRC Meeting. It was brought to the 4/6/26 meeting for an extension to be heard at the 4/13/26 meeting. The extension was granted. A motion to rehear will be needed. LDC 6.13.6 A(3), C(3) - Stormwater quality criteria CODE states A (3) The following systems shall be considered as meeting the County's stormwater quality criteria:(a) Systems that demonstrate numerically the post-development stormwater quality is equal to or better than the pre-development stormwater quality using methodology approved by the County Engineer or his designee. Consideration shall be for both surface water and groundwater; or (b) Dry retention systems that have a depth of four feet or less, measured from top of bank to pond bottom, and shall have a vegetative cover; or (c) Dry retention systems that have a depth of six feet or less, measured from t   Not available
2026-22657 16.2.New BusinessGolden Ocala - WEC Multi-Use Field Phase1 - Major Site Plan 32969 - Waiver to Major Site Plan in Review Parcel #: 21087-001-02 # WaiverPIR-000568-2026 Tillman & Associates Engineering, LLC LDC 2.21.3.C - Review and Approval Procedures CODE states Upon approval by DRC, a Building Permit may be issued and such approval is authority for applicant to proceed with the site improvements shown on the approved Major Site Plan. APPLICANT requests waiver to allow release of the building permits prior to the approval of the Major Site Plan. Requested building permits include BLDC-26-03-00833 (maintenance), BLDC-26-03-00834 Covered Seating), BLDC-26-03-00842 (Restroom), BLDC-26-03-00843 (Storage), and BLDC-26-03-00844 (Restaurant). Request is at Owner's own risk, subject to hold on final inspection, until MSP appr.   Not available
2026-22658 16.3.New BusinessGolden Ocala - WEC Multi-Use Field Phase1 - Major Site Plan 32969 - Waiver to Major Site Plan in Review Parcel #: 21087-001-02 # WaiverPIR-000593-2026 Tillman & Associates Engineering, LLC LDC 6.13.6 - Stormwater Quality Criteria CODE states Methodology. Stormwater management systems may be designed using a combination of design techniques ranging from traditional to low impact. The method(s) utilized shall focus on enhancing the quality of stormwater discharge and recharge through shallow systems, the processes of adsorption, filtration, denitrification, ion exchange, nutrient uptake, microbial activity, and decomposition. APPLICANT request waiver from Marion County LDC Water Quality criteria, to instead provide water quality in accordance with new Statewide Stormwater Rule (62-330 F.A.C.) including required reductions in Total Nitrogen (TN) and Total Phosphorus (TP).   Not available
2026-22659 16.4.New BusinessCalesa Equine Amenity - Major Site Plan 000106 - Waiver to Major Site Plan in Review Parcel #: 35300-000-45 #WaiverPIR-000590-2026 Kimley-Horn and Associates LDC 6.13.3.C Types of stormwater management facilities CODE states Proposed public. (1) Retention/detention areas shall have side slopes no steeper than 4:1 (horizontal: vertical) with a minimum berm width of 12 feet stabilized at six percent grade maximum around the entire perimeter of the facility. Side slopes steeper than 4:1 may be allowed with additional accommodations related to public safety, maintenance, and access upon approval by the County Engineer or his designee. (2) Stormwater management systems servicing a public development shall be owned and maintained by Marion County. They may be privately owned and maintained, upon approval by the County Engineer and granting of an easement to Marion County, minimally allowing but not obligating, emergency maintenance, as well as access to, drainage of, conveyance of, and storage of stormwater. (3) If fencing is used, it shall be per the County Fence Detail found in   Not available
2026-22525 16.5.New Business3950 NE 15th Court Rd - Waiver to Major Site Plan Parcel #: 15810-000-17 #WaiverSTA-000457-2026 Fred Bennett This item was tabled for two weeks at the 3/30/26 DRC meeting due to the applicant not being present. LDC 6.14.2(B)(a) Connection requirements CODE states (a )New development in the Urban or Rural area shall connect to a centralized water system with available capacity if a water line is within a connection distance of 400 feet times the total number of Equivalent Residential Connections (ERCs) APPLICANT requests a waiver from reconnecting to the public water available.   Not available
   7. CONCEPTUAL REVIEW ITEMS:   Not available
   8. DISCUSSION ITEMS:   Not available
   9. OTHER ITEMS:   Not available
   10. ADJOURN:   Not available